International Journal of Engineering
Trends and Technology

Research Article | Open Access | Download PDF

Volume 65 | Number 1 | Year 2018 | Article Id. IJETT-V65P209 | DOI : https://doi.org/10.14445/22315381/IJETT-V65P209

Planning and Programming of the Production of a Micro-Company of Bags and Bags


Maiza Garonce Ferreira, Tiago Bittencourt Nazaré, Paulo Henrique Silva Lopes

Citation :

Maiza Garonce Ferreira, Tiago Bittencourt Nazaré, Paulo Henrique Silva Lopes, "Planning and Programming of the Production of a Micro-Company of Bags and Bags," International Journal of Engineering Trends and Technology (IJETT), vol. 65, no. 1, pp. 43-48, 2018. Crossref, https://doi.org/10.14445/22315381/IJETT-V65P209

Abstract

Efficient programming is of paramount importance to the competitiveness of companies, in addition to reducing idleness in the resources it provides reliability in the delivery dates. The aim of the present study was to use AS Preactor Express 2016® software to simulate the current production process of a bag and bag company and to test different sequencing alternatives in order to find a method that minimizes the number of back orders existing in the company, and thus contribute to the company`s competitiveness. The methodology used was a case study, in which the necessary data were obtained locally through direct observation and documentary analysis. The data were entered into the software and different sequencing alternatives were tested. Comparing the obtained results, it was observed that the backward sequencing by priority presented the best result, since, considering the existence of higher orders, it serves a higher number of orders that have greater representativeness for the company.


Keywords

Sequencing, simulation, AS Preactor Express 2016.

References

[1] D. M. Nunes; P. A. C. Melo and I. S. C. Nigro. Planejamento, Programação e Controle da Produção: o uso da simulação do PREACTOR em uma indústria de alimentos. Salvador: ENEGEP, 2009.
[2] G. C. Meneghello and D. S. Martins. APS (Advanced Planning & Scheduling) – A utilização do sistema de capacidade finita como diferencial competitivos. Revista Eletrônica de Graduação- Regrad - UNIVEM, Marília, São Paulo, v. 8, n. 1, p. 51-74, 2015.
[3] J. J. S. Fonseca, “Metodologia da pesquisa científica”. Fortaleza: UEC, 2002.
[4] L. A. Silva, G. M. B. Araújo, T. D. C. Carneiro and P. P. P. Araújo. “Compreendendo os itens de maior rotatividade de uma MPE do setor gastronômico através da Curva ABC: estudo de caso no restaurante ponto certo em Caicó/RN”. Revista Livre de Sustentabilidade e Empreendedorismo, vol. 3, n. 2, p. 97-135, 2018.
[5] H. Pozo, Administração de Recursos Materiais e Patrimoniais. 6th ed., Ed. Atlas, 2010.
[6] B. T. Santos and Cleidice Lubiana. O uso da curva ABC para a tomada de decisão na composição de estoque. Ouro Preto: UNEOURO, 2017.
[7] C. K Oliveira, H. G. Menck, , P. Y. Takito, E. R. Cirilo, P. L. Natti and E. R. T. Natti. Stock Management (Gestão de Estoques).Coronell University Library.2018
[8] (2016) The Siemens website. [Online]. Available: http://www.siemens.com/preactorCopyright© Siemens AG 2016. Revision 43727
[9] (2011) The Preactor website. [Online]. Available: http://www.preactor.com/Company/News-Articles/Preactor-Express-Proves-Runaway-Success

Time: 0.0014 sec Memory: 32 KB
Current: 1.88 MB
Peak: 4 MB